EXECUTIVE SUMMARY

  1. INTRODUCTION
  2. SITUATION ASSESSMENT
  3. WORKSHOP
  4. INITIAL INFORMATION PRODUCT IDENTIFICATION
  5. INITIAL PRIORITIZATION
  6. DETAILED INFORMATION PRODUCT DESCRIPTIONS
  7. PRELIMINARY GIS STRATEGY
  8. TECHNOLOGY MANAGEMENT PLAN

    • a. 8.1 System Capability requirements
  9. DATA MANAGEMENT PLAN

    • a. 9.1 Master input data list
      b. 9.2 Database building strategy
      c. 9.3 Tolerance to error
      d. 9.4 Database design considerations
  10. IMPLEMENTATION PLAN

    • a. 10.1 Implementation timing
      b. 10.2 System configuration
      c. 10.3 Staffing
      d. 10.4 Cost model
      e. 10.5 Benefit-cost analysis